New plan for L train tunnel
The original plan, adopted by the Metropolitan Transportation Authority after lengthy public debate, had called for a complete shutdown of a portion of the L line for 15 months while workers repaired damage from 2012's Superstorm Sandy, when salty, corrosive water flooded 7 miles (11 kilometers) of the tube.